Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/985
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSahil, Walid-
dc.date.accessioned2024-06-09T15:13:52Z-
dc.date.available2024-06-09T15:13:52Z-
dc.date.issued2021-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/985-
dc.description.abstractIn the setting of the national strategy concerning conservation of water, in order to mobilize an important quality of water that is lost (dismissal in sea). The ANBT saw it self-achieving dams. However the survey, the choice and the dimensionality of the storage works deserve to be deepened Our work involves the study of the preliminary detailed draft of dam spillway and therefore the main objective was to determine the highest flow rate to determine the appropriate dimensions of the CHEURFAS II dam spillway (W -MASCARA).en_US
dc.language.isofren_US
dc.subjectBarrages. Crues. Barrage Cheurfas. Evacuation. Oued Mebtouh. Mascara. Algérieen_US
dc.subjectDams. Floods. Cheurfas dam. Evacuation. Oued Mebtouh. Mascara. Algeriaen_US
dc.titleEtude d'avant projet détaillé d'évacuateur de crues du barrage de Cheurfas II sur Oued Mebtouh (w. Mascara)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Ouvrages Hydrotechniques

Files in This Item:
File Description SizeFormat 
5-0005-21D.pdfTexte intégral84,19 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.