Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/944
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMerine, Fatima Zohra-
dc.date.accessioned2024-06-05T11:10:42Z-
dc.date.available2024-06-05T11:10:42Z-
dc.date.issued2023-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/944-
dc.description.abstractOur main objective is to ensure the supply of drinking water to the town of Mascara using the (Tizi) pumping station. This city has experienced significant population and urban growth, which has led to problems related to insufficient availability of water resources to meet the increasing demand for water. This study aims to design a complete water supply system, including reservoirs and pumping station, to implement measures to protect the pipes against a transient phenomenon called "water hammer", and to develop a methodology for the implementation of the project, as well as the resources necessary for its completion.en_US
dc.language.isofren_US
dc.subjectEau potable. Adduction. Station de pompage. Tizi Mascara. Algérieen_US
dc.subjectDrinking water supply. Study. Pumping station Tizi. Mascara. Algeria.en_US
dc.titleEtude du système d'adduction pour l'alimentation en eau potable de la ville de Mascara à partir de la station de pompage de Tizi (w. Mascara)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0015-23D.pdfFull Text4,8 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.