Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/890
Title: Raccordement de la station de dessalement d'eau de mer au réseau existant de Fouka (w. Tipaza)
Authors: Bensghir, Amine
Keywords: Eau potable. Raccordement. Dessalement. Eau de mer. Fouka. Tipaza. Algrie
Drinking water. Diagnostic. Fouka. Tipaza. Algeria.
Issue Date: 2009
Abstract: The load pipes meet together, so much in gravitary adduction or by repression that in distribution from the reservoir. We will examine, after the presentation of our zone of study and the estimation of its needs in water, the conditions in which will have to be established our mixed adduction (gravitary-repression) from a technical and economic point of view, those two aspects being, in fact, bound together. In the repression pipe, waters are raised by pumping plants, we will study, their conditions of establishement of retake plants of the adduction chain. We will tackle therafter, a protection means of the repression pipes, in particular, against a transitory phenomenon called: the water hammer. Finally, we tackle the methodology to implement the project and different means deployed for its working out.
URI: http://localhost:8080/xmlui/handle/123456789/890
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0013-09D.pdfFull Text2,12 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.