Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/123456789/889
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Tameur, Mehdi Bouâmama | - |
dc.date.accessioned | 2024-05-28T14:14:58Z | - |
dc.date.available | 2024-05-28T14:14:58Z | - |
dc.date.issued | 2009 | - |
dc.identifier.uri | http://localhost:8080/xmlui/handle/123456789/889 | - |
dc.description.abstract | Water supply network requires correctly dimensioned pipes in order to allow a good performance of these networks. For that, we gathered all information relating to the zone of study by taking into account all the methods for the determination of the water requirements. A design of the storage structures was made to make up the deficit of the existing tanks. | en_US |
dc.language.iso | fr | en_US |
dc.subject | Eau potable. adduction. Lot 3. Barrage Koudiet Asserdoune. Ain Bessem. Boughzoul. Bouira. Medéa. Algrie. | en_US |
dc.subject | Drinking water. Adduction. Koudiet Asserdoune Dam. Ain Bessem. Boughzoul. Bouira. Medéa. Algeria | en_US |
dc.title | Alimentation en eau potable du lot 3 à partir du Barrage de Koudiet Asserdoune (adduction Ain Bessem W de BoUira – Boughzoul W. Médéa) | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | Conception des Systèmes d'A.E.P |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
1-0012-09D.pdf | Full Text | 6,36 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.