Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/889
Full metadata record
DC FieldValueLanguage
dc.contributor.authorTameur, Mehdi Bouâmama-
dc.date.accessioned2024-05-28T14:14:58Z-
dc.date.available2024-05-28T14:14:58Z-
dc.date.issued2009-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/889-
dc.description.abstractWater supply network requires correctly dimensioned pipes in order to allow a good performance of these networks. For that, we gathered all information relating to the zone of study by taking into account all the methods for the determination of the water requirements. A design of the storage structures was made to make up the deficit of the existing tanks.en_US
dc.language.isofren_US
dc.subjectEau potable. adduction. Lot 3. Barrage Koudiet Asserdoune. Ain Bessem. Boughzoul. Bouira. Medéa. Algrie.en_US
dc.subjectDrinking water. Adduction. Koudiet Asserdoune Dam. Ain Bessem. Boughzoul. Bouira. Medéa. Algeriaen_US
dc.titleAlimentation en eau potable du lot 3 à partir du Barrage de Koudiet Asserdoune (adduction Ain Bessem W de BoUira – Boughzoul W. Médéa)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0012-09D.pdfFull Text6,36 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.