Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/864
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBoularas, Salah-
dc.date.accessioned2024-05-09T13:23:04Z-
dc.date.available2024-05-09T13:23:04Z-
dc.date.issued2010-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/864-
dc.description.abstractThrough this work, we have made the finding of a shortage of drinking water for the town of Ain Turk. For the following and after mobilized other resources we proceeded to design a new intake pipe that takes its starting level Wellfield (4 holes) through the pump station of Bouira. The water is routed to the buffer tank through the rework station Ain Turk. Subsequently the distribution of power to the storage tanks will be made to carry the water to the residents with a significant flow and pressure.en_US
dc.language.isofren_US
dc.subjectEau potable. Adduction. Etude. Ain Turk. Bouira. Algérie.en_US
dc.subjectWater Supply. Adduction (Study). Ain Turk. Bouira. Algeria.en_US
dc.titleEtude de l'adduction pour l'alimentation en eau potable de Ain Turk (w. Bouira)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0015-10D.pdfFull Text3,08 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.