Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/851
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBouloudenine, Youcef-
dc.date.accessioned2024-05-09T09:38:10Z-
dc.date.available2024-05-09T09:38:10Z-
dc.date.issued2010-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/851-
dc.description.abstractThrough the study that we presented, we initially gave highlights on the situation current of the hydraulic resources, network and the work of storage, then we passed to the estimate of the requirements out of water for the population for Ben-Salah until the year 2040, and the estimate of the deficit at the time D `a comparison between the resources and the requests, then we made a hydraulic and physical diagnosis system of drinking water supply (of drillings until the distribution), and found recommendations and solutions of the problems encountered during the diagnosis. Considering the outdatedness of the delivery system and their bad results (pressure and speed) which is out the standards for the majority of the sections and nodes, we reconfigured another system of the type with a grid, and for storage capacity we propose the another tank standards installation of twinned (same dimensionings, and characteristics for both) and as new chapters we spoke about the development about the model about simulation (water-cad), and the water treatment by chlorine at the time of the distribution.en_US
dc.language.isofren_US
dc.subjectEau potable. Diagnostic. Ben Salah (ville). Blida. Algérieen_US
dc.subjectWater Supply. Diagnostic. Ben Salah (city). Blida. Algeria.en_US
dc.titleDiagnostic du réseau d'AEP de la ville Ben-Salah (w. Blida)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0002-10D.pdfFull Text32,45 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.