Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/123456789/763
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Meziani, Mohamed | - |
dc.contributor.author | Meziani, Mohamed | - |
dc.date.accessioned | 2024-03-03T13:01:32Z | - |
dc.date.available | 2024-03-03T13:01:32Z | - |
dc.date.issued | 2013 | - |
dc.date.issued | 2013 | - |
dc.identifier.uri | http://localhost:8080/xmlui/handle/123456789/763 | - |
dc.description.abstract | The objective of our study is the satisfaction of water needs of TELEGHMA W. MILA for the year 2035, by construction a network of alimentation by potable water for 36874 meter long of type PEHD. In this study we give the priority to two sides: technical and economic just for making sure that the pressure and the flow are suitable. | en_US |
dc.language.iso | fr | en_US |
dc.language.iso | fr | en_US |
dc.subject | Eau potable (Etude) . Teleghma ( ville). Mila. Algérie. | en_US |
dc.subject | Drinking water. Adduction (Study). Teleghma. Mila. Algeria | en_US |
dc.title | Etude d'AEP de la ville Teleghma (w. Mila ) | en_US |
dc.title | Etude d'AEP de la ville Teleghma (w. Mila ) | en_US |
dc.type | Thesis | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | Conception des Systèmes d'A.E.P |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
1-0040-13D.pdf | Full Text | 6,95 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.