Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/744
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBenhamidcha, Esma-
dc.date.accessioned2024-02-29T09:51:28Z-
dc.date.available2024-02-29T09:51:28Z-
dc.date.issued2013-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/744-
dc.description.abstractThe Beni Oulbane city currently recognizes a cruel problem in terms of drinking water supply. Therefore, the objective of this study is to satisfy our agglomeration perspective needs for drinking water supply by means of the transmission lines between a drinking water treatment and our city. For that, we gathered all information relating to the zone of study for the determination of the requirements out of water. A dimensioning of the works of storage was worked out to make up the deficit of the existing tanks. A detailed calculation (diameters, pressure; and protection of the conduits) was made. Finally, an organization of building site was treated with pipe-laying.en_US
dc.language.isofren_US
dc.subjectEau potable. Adduction (étude). Guenitra (barrage). Beni Oualbane (commune). Skikda.en_US
dc.subjectDrinking water. Adduction (Study). Guenitra. Beni Oulbane (city). Skikda. Algeriaen_US
dc.titleEtude d'adduction a partir du barrage de Guenitra vers la commune de Beni Oualbane (w. Skikda)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0021-13D.pdfFull Text2,02 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.