Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/655
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBelkhiri, Abdelatif-
dc.date.accessioned2024-02-06T10:16:18Z-
dc.date.available2024-02-06T10:16:18Z-
dc.date.issued2015-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/655-
dc.description.abstractSystem of adduction of drinking water of the urban areas Makhemra , Lachbour and Zennouna Kebira of Municipalities of El Achir (Bordj Bou Arreridj ) is unfinished, Accordingly, this work consists of a project of adductions for satisfying the consumers needs in drinking water supply until the horizon of 2042.Thus, this study concerns the network of water transfer from drilling of Faide El Atrousse to a Temper tank by three pumping plants, after to the tanks of distribution for regions by gravity system.en_US
dc.language.isofren_US
dc.subjectEau potable. Makhemra. Zennouna Kebira. Lachbour. El Achir (commune). Bordj Bou Arreridj. Algérieen_US
dc.subjectDrinkin Wtaer. Study. Makhemra. Zennouna Kebira. Lachbour. El Achir (commune). Bordj Bou Arreridj. Algeria.en_US
dc.titleAlimentation en eau potable des centre Makhemra, Zennouna Kebira et Lachbour commune d'El Achir (w. Bordj Bou Arreridj)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0004-15D.pdfFull Text10,86 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.