Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/627
Full metadata record
DC FieldValueLanguage
dc.contributor.authorGataa, Nabila-
dc.date.accessioned2023-11-20T09:27:59Z-
dc.date.available2023-11-20T09:27:59Z-
dc.date.issued2016-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/627-
dc.description.abstractThe aim of this study it is to make a pumping system of rehabilitation of the source of the pumping station TALLAIZID (w.Blida), to improve its production efficiency and meet the demand for water. This discussion covers all the works of this pumping source system and should allow in particular the elimination the malfunctions and offering simultaneously amenities to improve the use of water from that source. And to do that, we spent the first part of the diagnosis and analysis of the performance state of the existing supply system , which will allow us to detect different system problems in question in order to provide adequate alternatives , In the 2nd part we will make a rehabilitation of the existing pumping station to remedy these problems and have a perfect delivery system. In the third part, we estimate the cost of this work. Finally, in the last part , we are interested in the impact of the station on the environment and health and work safety.en_US
dc.language.isofren_US
dc.subjectEau potable. Réhabilitation. Station de Pompage. Tallaizid. Chréa. Blida. Algérie.en_US
dc.subjectDrinking water. Rehabilitation. Pumping station. Tallaizid. Chréa. Blida. Algeriaen_US
dc.titleRéhabilitation de la station de pompage Tallaizid a partir de la station vers l'ouvrage de sortie Chréa (w. Blida)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0013-16D.pdfFull Text11 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.