Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/123456789/626
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Kadri, Naoual | - |
dc.date.accessioned | 2023-11-20T09:16:58Z | - |
dc.date.available | 2023-11-20T09:16:58Z | - |
dc.date.issued | 2016 | - |
dc.identifier.uri | http://localhost:8080/xmlui/handle/123456789/626 | - |
dc.description.abstract | Our work consists in studding the rehabilitation of the drinking water supply system of the town of Tichy (BEJAIA), i.e. the determination of the failures of the adduction and distribution network as well as the works of storage (water tanks) in the east side of the town in a part then conceive a network of drinking water in the west side of the town. For this purpose the checking will enable us to give certain numbers of modifications and recommendations to improve the drinking water supply of the city and also a network of adduction, works of storage and distribution were dimensioned. | en_US |
dc.language.iso | fr | en_US |
dc.subject | Eau potable. Diagnostic. Réhabilitation. Tichy (ville). Bejaia. Algérie. | en_US |
dc.subject | Drinking water. Diagnostic. Rehabilitation. Tichy (ville). Bejaia. Algeria. | en_US |
dc.title | Diagnostic et réhabilitation du réseau d'alimentation en eau potable de la ville de Tichy (w. Bejaia) | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | Conception des Systèmes d'A.E.P |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
1-0012-16D.pdf | Full Text | 6,26 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.