Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/593
Full metadata record
DC FieldValueLanguage
dc.contributor.authorChekroud, Walid-
dc.date.accessioned2023-09-13T13:24:56Z-
dc.date.available2023-09-13T13:24:56Z-
dc.date.issued2017-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/593-
dc.description.abstractOur study consists of feeding the new industrial zone of Balara (w.Jijel ) by water with the necessary quantity that enters the process of industrial production of the different factories projected. The study begins with the presentation of the concerned area, Then we passed to estimate the water requirements, At the end, we determined the dimensions of pipes. In order to improve production capacity and ensure an adequate supply of drinking water, all the necessary structures and the methodology for their implementation must be defined.en_US
dc.language.isofren_US
dc.subjectEau potable. Etude. Zone industrielle. Bellara. Jijel. Algérie.en_US
dc.subjectDrinking water. Study. Industrial zone. Bellara. Jijel. Algeria.en_US
dc.titleAlimentation en eaux de la zone industrielle de Bellara (w. Jijel)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0012-17D.pdfFull Text2,57 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.