Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/589
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMerzouki, Walid-
dc.date.accessioned2023-09-12T10:55:12Z-
dc.date.available2023-09-12T10:55:12Z-
dc.date.issued2017-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/589-
dc.description.abstractThe objective of this project is to fulfill the drinking water deficit of the city of Baghlia wilaya of Boumerdes, the deficit in drinking water is caused by the insufficient quantity of water transported and the extension of the city. For that We sized a supply system (pumping station, repression pipe) and storage tanks after estimating the different needs to convey the necessary flow. The project conposed of eight chapters that illustrate the sizing of the pumping station as well as the repression pipe to the city of Baghlia, trying to opt for a more economical estimate. As well as the dimensioning of an air tank to protect the pipe against water hammer.en_US
dc.language.isofren_US
dc.subjectEau potable. Adduction. Baghlia. Boumerdes. Algérie.en_US
dc.subjectDrinking water. Adduction. Baghlia. Boumerdes. Algeria.en_US
dc.titleEtude d'adduction de la ville de Baghlia (w. Boumerdes)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0008-17D.pdfFull Text6 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.