Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/560
Full metadata record
DC FieldValueLanguage
dc.contributor.authorYahia, Ayoub-
dc.date.accessioned2023-09-06T13:45:04Z-
dc.date.available2023-09-06T13:45:04Z-
dc.date.issued2018-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/560-
dc.description.abstractAfter having presented the region the subject of our study and evaluate its drinking water needs , we studied and developed an appropriate system for meeting the new town of Bouinan , city of Blida, with drinking water in order to accomodate its future needs. Our study is carried out according to the following four steps: studying and dimensioning the distribution network of the town in order to satisfy the agglomeration qualitatively and quantitatively, examining the adduction taking into account the connected technical and economic factors, looking for ways to protect the pipes against the transitory phenomenon called "water hammer" and finally taking various measures to successfully acheive our project.en_US
dc.language.isofren_US
dc.subjectEau potable Réseau. 5000 Logement. Blida. Algérie.en_US
dc.subjectWater drinking. Evaluat. 5000 town. Blida. Algeria.en_US
dc.titleConception du réseau d'alimentation en eau potable de la nouvelle ville de Bouinan <<5000 logements>> (w. Blida)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0003-18D.pdfFull Text4,39 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.