Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/553
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMeherhera, Sifeddine-
dc.date.accessioned2023-09-06T08:23:36Z-
dc.date.available2023-09-06T08:23:36Z-
dc.date.issued2019-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/553-
dc.description.abstractThis study consists in supplying ASSERDOUNE area with drinking water through installing a system in accordance with the existing as well as future habitats in order to ensure a long-term distribution regarding the planned construction of a new city that will be located in this area. The area contains a 3000 m³ distribution tank without an existing drinking water supply system supplied by a 35000-m³ supply tank, feeded by the Boussiaba dam of EL MILIA.en_US
dc.language.isofren_US
dc.subjectEau potable. Alimentation. Asserdoune. El Milia. Jijel. Algérie.en_US
dc.subjectDrinking water supply. Asserdoune. El Milia. Jijel. Algeria.en_US
dc.titleDimensionnement du système d'alimentation en eau potable de la zone d'Asserdoune commune El Milia (w. Jijel)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0013-19D.pdfFull Text4,25 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.