Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/497
Title: Renforcement du réseau d'AEP de la ville de Cherchell (w. Tipaza) à partir du barrage Boukerdane (w. Tipaza)
Authors: Mebarki, Mohamed
Keywords: Eau potable. Renforcement. Barrage Boukerdane. Cherchell. Tipaza. Algérie.
water supply system. Estimation of water needs. Adductions. Reservoirs. Pumps, Dam Boukerdane. Cherchell. Tipaza. Algeria.
Issue Date: 2021
Abstract: The city of Cherchell, which is located in the western part of Wilaya of Tipaza, suffers from a deficit in drinking water supply because of the increase in the population, which calls for a water supply system to be built from the Boukerdane dam. After presenting the study area, the estimate of the agglomeration's water needs for the study horizon 2051, shows the deficit to be filled equal to seventy-seven thousand cubic meters per day. This deficit helps to size eleven adductions and to check the capacity of eleven reservoirs. Also, a selection of adapted pumps to the network was made. Finally, the bill of quantities calculation makes it possible to make a project cost estimate which equal to Seven hundred and seventy-two million DA.
URI: http://localhost:8080/xmlui/handle/123456789/497
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0017-21D.pdf5,78 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.