Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/493
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAouchiche, Seddik-
dc.date.accessioned2023-07-04T08:30:37Z-
dc.date.available2023-07-04T08:30:37Z-
dc.date.issued2021-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/493-
dc.description.abstractThe present report presents a project of reinforcement in drinking water of the commune of Bouzguene. The commune supplied by the source adardar and the drillings of oued boubhir suffers from an extreme lack of water, and to cure this problem, a solution was worked out which is to convey the water starting from the piquage on the pipe of supply (Tich haff-béjaia) at the level of ouzelaguène. After the presentation of our study area and the estimation of its water needs, a technical and economic study of the supply was carried out to find the diameters of the pipes. Then the appropriate pumps were chosen for each pumping station. We will then look at a means of protecting the pipes against a transient phenomenon known as water hammer. At the end of our work, we will deal with the methodology of implementation of the necessary means for the realization and the execution of the works.en_US
dc.language.isofren_US
dc.subjectEau potable. Renforcement. Bouzguene (commune). Tichi-Haff. Béjaia. Tizi Ouzou. Algérie.en_US
dc.subjectDrinking water. Reinforcement. Bouzguene (commune). Tichi-Haff. Béjaia. Tizi Ouzou. Algeria.en_US
dc.titleEtude de renforcement en AEP de la commune de Bouzguene (w. Tizi-Ouzou) a partir du barrage Tichi-Haff (w. Bejaia)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'A.E.P

Files in This Item:
File Description SizeFormat 
1-0013-21D.pdfFull Text5,77 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.