Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2299
Full metadata record
DC FieldValueLanguage
dc.contributor.authorZahouani, Sadek-
dc.date.accessioned2025-05-25T10:28:41Z-
dc.date.available2025-05-25T10:28:41Z-
dc.date.issued2013-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/2299-
dc.description.abstractOur study falls under the framework of the mobilization of surface water and environmental protection by the re-use of waste water. The study consists of the detailed study of preliminary draft of the additional works of the dam CB5 on the 5B84C7C Wadi in the willaya of 7;6C. After a feasibility study of the dam, we proposed additional alternatives of works, and choose the most appropriate, then we made a detailed study of the selected alternativesen_US
dc.language.isofren_US
dc.relation.ispartofseries5-0025-13;-
dc.subjectOuvrages annexes : Barrage : Bareken_US
dc.titleEtude d'avant projet détaillé des ouvrages annexes du barrage Barek (w. Blida)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Ouvrages Hydrotechniques

Files in This Item:
File Description SizeFormat 
5-0025-13.pdfMFE1,92 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.