Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2268
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSouani, Lamine-
dc.date.accessioned2025-05-19T13:57:23Z-
dc.date.available2025-05-19T13:57:23Z-
dc.date.issued2012-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/2268-
dc.description.abstractWithin the national strategy that aims at protecting water resources and storing big amounts of drinking water. To provide the agricultural needs. To build some carries Our dissertation is a attempt to build a dam in the river of BIBETA. The results, we realized some so satisfying from the technical and practical point of view.en_US
dc.language.isofren_US
dc.relation.ispartofseries5-0038-12;-
dc.subjectDigue : Barrage : Bibeta : Eltarfen_US
dc.titleEtude d'avant projet détaillée de la digue du barrage Bibeta, wilaya d'Eltarfen_US
dc.typeThesisen_US
Appears in Collections:Conception des Ouvrages Hydrotechniques

Files in This Item:
File Description SizeFormat 
5-0038-12.pdfMFE2,78 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.