Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/123456789/2268
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Souani, Lamine | - |
dc.date.accessioned | 2025-05-19T13:57:23Z | - |
dc.date.available | 2025-05-19T13:57:23Z | - |
dc.date.issued | 2012 | - |
dc.identifier.uri | http://localhost:8080/xmlui/handle/123456789/2268 | - |
dc.description.abstract | Within the national strategy that aims at protecting water resources and storing big amounts of drinking water. To provide the agricultural needs. To build some carries Our dissertation is a attempt to build a dam in the river of BIBETA. The results, we realized some so satisfying from the technical and practical point of view. | en_US |
dc.language.iso | fr | en_US |
dc.relation.ispartofseries | 5-0038-12; | - |
dc.subject | Digue : Barrage : Bibeta : Eltarf | en_US |
dc.title | Etude d'avant projet détaillée de la digue du barrage Bibeta, wilaya d'Eltarf | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | Conception des Ouvrages Hydrotechniques |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5-0038-12.pdf | MFE | 2,78 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.