Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/123456789/2240
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Bouras, Lyes | - |
dc.date.accessioned | 2025-05-19T10:00:26Z | - |
dc.date.available | 2025-05-19T10:00:26Z | - |
dc.date.issued | 2012 | - |
dc.identifier.uri | http://localhost:8080/xmlui/handle/123456789/2240 | - |
dc.description.abstract | Our dissertation aim is to conduct the study before detailed project of dam Djidiouia. That is located in Oued Djidiouia (Relizane), It is intended to supply safe drinking water and to irrigate surrounding agricultural fields. The dam is made of BCR-type with a spillway hardfill central embedded in the dam body and which serves to remove a flow of raw approximately 764m3/ s. The dam has a height of 60m and a capacity of around 81Mm3. | en_US |
dc.language.iso | fr | en_US |
dc.relation.ispartofseries | 5-0012-12; | - |
dc.subject | Digue : Barrage : Djidiouia | en_US |
dc.title | Etude d'avant projet détaillée de la digue du barrage Djidiouia (w. Relizane) | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | Conception des Ouvrages Hydrotechniques |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5-0012-12.pdf.pdf | MFE | 3,39 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.