Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/123456789/2222
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Houari, Abdelkader | - |
dc.date.accessioned | 2025-05-14T10:48:15Z | - |
dc.date.available | 2025-05-14T10:48:15Z | - |
dc.date.issued | 2011 | - |
dc.identifier.uri | http://localhost:8080/xmlui/handle/123456789/2222 | - |
dc.description.abstract | In the setting of the national strategy concerning conservation of water, in order to mobilize an important quality of water that is lost (dismissal in sea). The ANBT saw itself achieving dams. However the survey, the choice and the dimensionality of the storage works deserve to be deepened. Sow to survey we led in this thesis is a preparatory project detailed of the works annex of a stopping in the wilaya of CHLEF and mainly on the TARZOUTWadi | en_US |
dc.language.iso | fr | en_US |
dc.relation.ispartofseries | 5-0023-11; | - |
dc.subject | Ouvrages annexes : Vidange: Prise d’eau : Barrage :Tarzout | en_US |
dc.title | Etude d’avant projet détaillé des ouvrages annexes ( dérivation provisoire , Vidange de fond et prise d’eau ) du Barrage Tarzout (w. chlef | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | Conception des Ouvrages Hydrotechniques |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5-0023-11.pdf.pdf | MFE | 6,4 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.