Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2218
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSerier, Abdellah M.-
dc.date.accessioned2025-05-14T10:34:31Z-
dc.date.available2025-05-14T10:34:31Z-
dc.date.issued2011-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/2218-
dc.description.abstractAs part of the national strategy which aims to preserve water resources to store four million cubic meters to meet the needs of the area of water resources, which is why the National Agency for dams and transfers sees the need for water barriers in the region of Ain Temouchent, and according to our study before detailed design of the dam a dam in the Ain Temouchent wilaya, We have obtained satisfactory results from technical perspective and practicalen_US
dc.language.isofren_US
dc.relation.ispartofseries5-0019-11;-
dc.subjectDigue : Barrage : Berkecheen_US
dc.titleEtude d'avant projet détaillé de la digue du barrage de Berkeche (w. Ain Temouchent)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Ouvrages Hydrotechniques

Files in This Item:
File Description SizeFormat 
5-0019-11.pdfMFE4,22 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.