Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2161
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBouziane, Ali-
dc.date.accessioned2025-02-10T09:17:51Z-
dc.date.available2025-02-10T09:17:51Z-
dc.date.issued2014-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/2161-
dc.descriptionMFEen_US
dc.description.abstractThe realization of a purification station at the level of the city of Zighoud Youcef (Constantine) is necessary in order to protect the public health, as well as the receiving environment (Oued smendou) because this last pours directly toward the Dam of Beni Haroune.In this present work we have made a comparative survey between two variants middle and weak load. The choice of this purification variant and the dimensionality of his/her/its different works of treatment have been done to basis of the calculus results, as well as the advantages and the disadvantages of every varianten_US
dc.language.isofren_US
dc.subjectEpuration, Conception, Zighoud Yuocef (ville), Constantineen_US
dc.titleConception de la station d'épuration de la ville de Zighoud Yuocef (w. Constantine)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'Assainissement

Files in This Item:
File Description SizeFormat 
4-0027-14.pdf2,98 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.