Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2157
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBezai, Zine el abidine-
dc.date.accessioned2025-02-09T09:10:00Z-
dc.date.available2025-02-09T09:10:00Z-
dc.date.issued2014-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/2157-
dc.descriptionMFEen_US
dc.description.abstractOur dissertation turns around establishing a water purification station for used water in the tour ARRIS (BATNA).This study aims at protecting the natural environment as well as the public health. The study in turn is divided into two phases: 1-The first phase permits to treat the used water of 44597 inhabitants until 2025 2-the second aims at enlarging the station to raise the its capacity to 62817 until 2040en_US
dc.language.isofren_US
dc.subjectEpuration, Dimensionnement, Arris, Batnaen_US
dc.titleDimensionnement de la station d'epuration de la d'Arris (w. Batna)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'Assainissement

Files in This Item:
File Description SizeFormat 
4-0023-14.pdf7,81 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.