Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/123456789/2125
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Allel, Ahmed | - |
dc.date.accessioned | 2025-02-04T14:56:18Z | - |
dc.date.available | 2025-02-04T14:56:18Z | - |
dc.date.issued | 2010 | - |
dc.identifier.uri | http://localhost:8080/xmlui/handle/123456789/2125 | - |
dc.description.abstract | Dams are the big reserves of water wich are used in divers fields. The purpose of this work is to study if we can realize a dam on Oued of HAMMAIMIA (W.BOUIRA) on point view geology hydrology and economic. for irrigation of a perimeter of 125 ha. Like for every similar work we study geology hydrology and study variants in order to repair the choice of the dam to conceive. Next we understand a dam and understand state workmanship We terminate by organization of road works and protection and safety of working. | en_US |
dc.language.iso | fr | en_US |
dc.relation.ispartofseries | 5-0007-10; | - |
dc.subject | Faisabilité ; Petit barrage ; Oued Hammaimia | en_US |
dc.title | Etude de faisabilité d'un petit barrage sur Oued Hammaimia (w. Bouira) | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | Conception des Ouvrages Hydrotechniques |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5-0007-10.pdf.pdf | MFE | 53,22 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.