Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2125
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAllel, Ahmed-
dc.date.accessioned2025-02-04T14:56:18Z-
dc.date.available2025-02-04T14:56:18Z-
dc.date.issued2010-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/2125-
dc.description.abstractDams are the big reserves of water wich are used in divers fields. The purpose of this work is to study if we can realize a dam on Oued of HAMMAIMIA (W.BOUIRA) on point view geology hydrology and economic. for irrigation of a perimeter of 125 ha. Like for every similar work we study geology hydrology and study variants in order to repair the choice of the dam to conceive. Next we understand a dam and understand state workmanship We terminate by organization of road works and protection and safety of working.en_US
dc.language.isofren_US
dc.relation.ispartofseries5-0007-10;-
dc.subjectFaisabilité ; Petit barrage ; Oued Hammaimiaen_US
dc.titleEtude de faisabilité d'un petit barrage sur Oued Hammaimia (w. Bouira)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Ouvrages Hydrotechniques

Files in This Item:
File Description SizeFormat 
5-0007-10.pdf.pdfMFE53,22 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.