Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2117
Title: Etude d'avant projet détaillée du barrage Zaouïa."Dérivation provisoire et tour de prise" (w. Tizi Ouzou )
Authors: Ourari, fayçal
Keywords: Barrage ; Zaouïa ; Dérivation provisoire
Issue Date: 2009
Series/Report no.: 5-0009-09;
Abstract: Dams are the big reserves of water, witch are used in divers fields. the purpose of this work is study first elaborate of transformation exception and tower of taking a water to a dam ZAOUIA on canyon (Stita) in reign of Tizi Ouzou on point view geology, hydrology, hydraulic and genie civil. Of the variant elected. Next we understand a dam and understand state workmanship; we terminate by organization of road works and protection and safety of working.
URI: http://localhost:8080/xmlui/handle/123456789/2117
Appears in Collections:Conception des Ouvrages Hydrotechniques

Files in This Item:
File Description SizeFormat 
5-0009-09.pdfMFE7,91 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.