Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/123456789/2117| Title: | Etude d'avant projet détaillée du barrage Zaouïa."Dérivation provisoire et tour de prise" (w. Tizi Ouzou ) |
| Authors: | Ourari, fayçal |
| Keywords: | Barrage ; Zaouïa ; Dérivation provisoire |
| Issue Date: | 2009 |
| Series/Report no.: | 5-0009-09; |
| Abstract: | Dams are the big reserves of water, witch are used in divers fields. the purpose of this work is study first elaborate of transformation exception and tower of taking a water to a dam ZAOUIA on canyon (Stita) in reign of Tizi Ouzou on point view geology, hydrology, hydraulic and genie civil. Of the variant elected. Next we understand a dam and understand state workmanship; we terminate by organization of road works and protection and safety of working. |
| URI: | http://localhost:8080/xmlui/handle/123456789/2117 |
| Appears in Collections: | Conception des Ouvrages Hydrotechniques |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 5-0009-09.pdf | MFE | 7,91 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.