Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2088
Title: Dimensionnement de la station d'épuration de la ville de Timgad (w. Batna)
Authors: Djebouri, Abderraouf
Keywords: Epuration, Dimensionnement, imgad, Batna
Issue Date: 2015
Abstract: Protection of water resources, environment, and public health make installation ofpurification plant in Timgad (Batna) which is more than necessary because of the danger ofpollution.In this work, we made a design of a wastewater treatment plant to activate sludge. The study is dividedinto two phases:  The first phase will address the pollution of 04722equivalent inhabitants by 2030.  The second phase (extension) corresponds to an increase of the initial capacity of the plant to a capacity of 26444equivalent inhabitants in 2045.
Description: MFE
URI: http://localhost:8080/xmlui/handle/123456789/2088
Appears in Collections:Conception des Systèmes d'Assainissement

Files in This Item:
File Description SizeFormat 
4-0025-15.pdf2,87 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.