Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2088
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDjebouri, Abderraouf-
dc.date.accessioned2025-01-30T10:04:50Z-
dc.date.available2025-01-30T10:04:50Z-
dc.date.issued2015-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/2088-
dc.descriptionMFEen_US
dc.description.abstractProtection of water resources, environment, and public health make installation ofpurification plant in Timgad (Batna) which is more than necessary because of the danger ofpollution.In this work, we made a design of a wastewater treatment plant to activate sludge. The study is dividedinto two phases:  The first phase will address the pollution of 04722equivalent inhabitants by 2030.  The second phase (extension) corresponds to an increase of the initial capacity of the plant to a capacity of 26444equivalent inhabitants in 2045.en_US
dc.language.isofren_US
dc.subjectEpuration, Dimensionnement, imgad, Batnaen_US
dc.titleDimensionnement de la station d'épuration de la ville de Timgad (w. Batna)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'Assainissement

Files in This Item:
File Description SizeFormat 
4-0025-15.pdf2,87 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.