Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2056
Title: Etude d'avant projet détaillé de la digue du barrage de Bou Nachi sur l'Oued
Authors: Hafi, Ilyes
Keywords: Avant projet ; Digue du barrage ; Bou Nachi
Issue Date: 2009
Series/Report no.: 5-0002-09;
Abstract: ln the setting of the national strategy concerning conservation of water, in order to mobilize an important quality of water that is lost (dismissal in sea and loss at the borders). The ANBT saw itself achieving dams. However the survey, the choice and the dimensionality of the storage works deserve to be deepened. Sow to survey we led in this thesis is a preliminary detail project of a dam in the wilaya of the area of TIZI OUZOU on Oued RABTA.
URI: http://localhost:8080/xmlui/handle/123456789/2056
Appears in Collections:Conception des Ouvrages Hydrotechniques

Files in This Item:
File Description SizeFormat 
5-0002-09.pdfMFE31,15 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.