Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/2031
Title: Dimensionnement de la chaine de post-traitement de l'usine de dessalement de Kouddiet Eddraouch wilaya d'El Tarf
Authors: Benslama, Chems-Eddine
Keywords: Desalination ; Post treatment ; Calco-carbonic equilibrium ; Calcite bed ; Calcite contactor’s
Issue Date: 2024
Series/Report no.: 3-0022-24;
Abstract: Algeria, facing increasing water challenges, relies on desalination to meet the demand for potable water. This thesis explores the optimization of post-treatment for desalinated water, focusing on remineralization using calcite and dolomite. A detailed analysis of the EL TARF desalination plant is conducted to assess the treatment methods. The core of the study is centered on the sizing of the calcite bed and a techno-economic comparison with dolomite. The goal is to identify the best approach to ensure water quality while controlling costs.
URI: http://localhost:8080/xmlui/handle/123456789/2031
Appears in Collections:Réutilisation des eaux non conventionnelles

Files in This Item:
File Description SizeFormat 
3-0022-24.pdfMFE4,1 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.