Please use this identifier to cite or link to this item:
http://localhost:8080/xmlui/handle/123456789/1905
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Maleg, Yasser Badr Eddine | - |
dc.date.accessioned | 2025-01-22T13:34:44Z | - |
dc.date.available | 2025-01-22T13:34:44Z | - |
dc.date.issued | 2024 | - |
dc.identifier.uri | http://localhost:8080/xmlui/handle/123456789/1905 | - |
dc.description | MFE | en_US |
dc.description.abstract | Our study area, located in the western part of the commune of THENIET EL HAD, (W. TISSEMSILT), consists of residential neighborhoods that have experienced significant expansion recently. The problem is that they use the wadis as outlets for sewage, which has led to environmental pollution and increased the risk of the spread of serious and contagious diseases among the residents. The objective of this study is to eliminate all points of random sewage discharge into the wadis and direct them to the treatment plant located at the northern entrance of the commune of Theniet El Had. To carry out this process, it is necessary to secure all these points and transfer this water through a two-phase system : the first using gravity pipelines and the second using pumping stations and pressure pipelines. | en_US |
dc.language.iso | fr | en_US |
dc.subject | THENIET EL HAD,Sewerage network, , Connection , Pressure pipelines | en_US |
dc.title | Etude du raccordement du réseau d'assainissement des deux extensions Oued Chaghlou et Ouled Meriem a la STEP de Theniet El had (w. Tissemsil | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | Conception des Systèmes d'Assainissement |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
4-0018-24.pdf | 8,38 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.