Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/1798
Full metadata record
DC FieldValueLanguage
dc.contributor.authorChekired, Selma-
dc.date.accessioned2025-01-16T09:19:08Z-
dc.date.available2025-01-16T09:19:08Z-
dc.date.issued2017-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/1798-
dc.descriptionMFEen_US
dc.description.abstractThe aim of this study is to envisage the deflection of the pipes that are currently on the land use of the mega project « MEDINA CENTER » at its limit. This deflection implies to dislodge the storm water discharge at sea that is currently in the middle of the reserved site of the futur marina « MARINA BAY ». For this, we diagnose the upstream sewerage system of Mohammedia whose discharge governs the hydraulic parameters of the deflection . We also envisage a partial rehabilitation of this system, so that it meets the futur needs of the township . Finally, we chose the adequate variant for the deflection.en_US
dc.language.isofren_US
dc.subjectDéviation, Collecteurs, Marina d'Alger, Medina-center, Mohammedia, Algeren_US
dc.titleDéviation de collecteurs en vue du projet " Marina d'Alger Medina-center " dans la commune de Mohammedia (w.d'Alger)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'Assainissement

Files in This Item:
File Description SizeFormat 
4-0026-17.pdf2,2 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.