Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/1714
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBendris, Mounira-
dc.date.accessioned2025-01-09T09:04:13Z-
dc.date.available2025-01-09T09:04:13Z-
dc.date.issued2013-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/1714-
dc.description.abstractDue to the problem of scarcity of water, we have to use purified wastewater, to supply the shortage of needs in the region of Touggourt. Accordingly, the aim of our present work has an aspect of the actual policy of the irrigated areas management in a way to attain a high investment output, showing a better efficiency of the irrigation system from one part, and a better management and potentialities preservation: water resource and ground resources from the other part.en_US
dc.language.isofren_US
dc.relation.ispartofseries2-0016-13;-
dc.subjectPérimètre ; Irrigation ; Touggourten_US
dc.titleEtude du périmètre d'irrigation de Touggourt (secteur n°1-170ha) à partir des eaux usées épurées de la STEP de Touggourt (w. Ouargla)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'Irrigation et de Drainage

Files in This Item:
File Description SizeFormat 
2-0016-13.pdfMFE6,59 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.