Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/1558
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSayad, Amel-Karima-
dc.date.accessioned2024-11-13T14:27:06Z-
dc.date.available2024-11-13T14:27:06Z-
dc.date.issued2015-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/1558-
dc.description.abstractThis submission concerns the study of reinforcement of khenchla's earth-fill dam using a piano keys weir (Pk-Weir) to increase the discharge capacity of the original spillway. The weir piano keys (Pk-Weir) represents a new optimum development solution to increase the discharge capacity of the weir and to confer additional security to the dike against all contingencies submersion or dam failure already existing This study includes maintenance and the dam auscultation system.en_US
dc.language.isofren_US
dc.subjectBarrage, Pk-Weir, Khenchla,en_US
dc.titleEtude de confortement du barrage de Babar (w. Khenchela)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Ouvrages Hydrotechniques

Files in This Item:
File Description SizeFormat 
5-0006-15.pdf7,16 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.