Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/1512
Full metadata record
DC FieldValueLanguage
dc.contributor.authorHambarek, Hadjer-
dc.date.accessioned2024-11-11T14:05:52Z-
dc.date.available2024-11-11T14:05:52Z-
dc.date.issued2016-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/1512-
dc.descriptionMFEen_US
dc.description.abstractWater has become a commodity increasingly less and accessible water reserves continue to drop; due to the drought, growing populations and dwindling new construction of dam’s sites. But additional water by the level of existing dams. For this installation fuses increases over the spillway of a dam is a interesting solution. As it allows to store additional water without changing the level of the highest water. In addition, they guarantee regarding flood safety.en_US
dc.language.isofren_US
dc.subjectFusegate , Elevation, Dam, Spillway, Water reservoir , Kef Eddiren_US
dc.subjectHausses fusibles, Surélévation, Barrage, Evacuateur de crue, Retenue d’eau , Kefen_US
dc.titleEtude du dimensionnement d'un deversoir à hausse fusible du barrage Kef Eddir (w. Tipaza )en_US
dc.typeThesisen_US
Appears in Collections:Conception des Ouvrages Hydrotechniques

Files in This Item:
File Description SizeFormat 
5-0022-16.pdf5,68 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.