Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/1381
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDib, Meriem-
dc.date.accessioned2024-10-23T09:17:49Z-
dc.date.available2024-10-23T09:17:49Z-
dc.date.issued2020-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/1381-
dc.descriptionMFEen_US
dc.description.abstractIn order to mobilize and preserve millions of cubic meters of water across the Algerian territory, the ANBT plans continuously to create more dams in order to exploit this water for the development of the agricultural sector and enhance drinking water supply. The auxiliary constructions make a very important part of a dam. However, the survey, the choice, and the dimensionality of the storage structure need to be deepened. This is precisely the subject of this thesis, which concerns the study of the auxiliary constructions of Chebabta dam on the Meskiana wadi, in the Wilaya of Oum El Bouaghi.en_US
dc.language.isofren_US
dc.subjectdam,auxiliary constructions, survey, Dimensionalityen_US
dc.subjectBarrage, Ouvrages annexes, Etude, Dimensionnement.en_US
dc.titleEtude des ouvrages annexes du barrage Chebabta (w. Oum El Bouaghi)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Ouvrages Hydrotechniques

Files in This Item:
File Description SizeFormat 
5-0021-20.pdf13,88 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.