dc.descriptionMFEen_US
dc.description.abstractWhen building a dam, ancillary structures must be planned for the protection and operation of the dam. Our end-of-study project contributes to the sizing of the ancillary structures of the ZAOUIA dam on the wadi of STITA the wilaya of Tizi Ouzou, the sizing of these structures was based on the topographical and geological conditions of the site, as well as the hydrology of the basin. pouring. This allows us to propose scenarios that include several variants in order to choose the right projection according to the technico-economic study. Two variants of the spillway were studied and then we opted for the lateral variant with lateral funneling. The temporary diversion was projected through the dike and an intake tower integrated into the body of the dam.en_US
dc.language.isofren_US
dc.subjectBarrage, Conception, Ouvrage annexes, Barrage Zaouia, Oued Stita, Tizi Ouzouen_US
dc.titleEtude de conception des ouvrages annexes du barrage Zaouia sur l'Oued de Stita (w. Tizi Ouzou)en_US
dc.typeThesisen_US
Appears in Collections:Conception des Ouvrages Hydrotechniques

Files in This Item:
File Description SizeFormat 
5-0017-20.pdf6,37 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.