Please use this identifier to cite or link to this item: http://localhost:8080/xmlui/handle/123456789/1034
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKhaldi, Taher Lotfi-
dc.date.accessioned2024-10-06T09:45:55Z-
dc.date.available2024-10-06T09:45:55Z-
dc.date.issued2023-
dc.identifier.urihttp://localhost:8080/xmlui/handle/123456789/1034-
dc.descriptionMFEen_US
dc.description.abstractThe objective of this project is to design an irrigation network, by dimensioning the main line fed by treated wastewater from the Ain El Turk wastewater treatment plant, intended for the Bousfer irrigation perimeter, which covers an area of 400 hectares. This study is based on a thorough analysis of climatic, soil, agronomic and hydraulic characteristics. The main objective is to increase agricultural yields in the region while contributing to the achievement of agricultural self-sufficiency. This will be achieved through the introduction of the most efficient irrigation systems and the implementation of an optimal water resource management strategy.en_US
dc.language.isofren_US
dc.relation.ispartofseries2-0023-23;-
dc.subjectirrigation, sizing, treated wastewater, perimeter Bousfer.en_US
dc.titleDimensionnement de la conduite de refoulement des eaux usées traitées de la STEP d'Ain El Turk vers le périmètre agricole de Bousfer (400 ha) wilaya d'Oranen_US
dc.typeThesisen_US
Appears in Collections:Conception des Systèmes d'Irrigation et de Drainage

Files in This Item:
File Description SizeFormat 
2-0023-23.pdfMFE5,2 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.